November 24, 2026

In the previous article of this series, we looked at the hidden cost of intelligence: the electricity and cooling that sit behind every large AI model. But energy is only half of the story. Once a supercomputer exists, a quieter question decides how much value and how much waste it produces: who gets to use it, when, and for what?

Every accelerator that sits idle while a queue of jobs waits is energy spent for nothing. This article looks at the problem of scheduling in AI-era computing, why it is harder than it looks, and how optimization and AI are being combined to solve it.

The waste hiding in plain sight

The scale of the demand is no secret. The International Energy Agency estimates that data centers consumed around 415 TWh in 2024, about 1.5% of global electricity, and expects this to more than double to around 945 TWh by 2030. Against that backdrop, how efficiently existing machines are used matters as much as how green their power is.

The evidence suggests there is a lot of room for improvement. A study of a two-month trace from a large multi-tenant GPU cluster used for deep learning at Microsoft found that in-use GPUs reached only about 52% hardware utilization on average. Two features of AI workloads explain much of this:

  • Gang scheduling. A distributed training job typically needs all of its GPUs at the same time. It waits in the queue until enough are free together, even if many individual GPUs are idle meanwhile.
  • Locality constraints. Jobs run faster when their GPUs sit close together, on the same server or the same network switch. Insisting on this leaves fragments of capacity that no waiting job can use.

In other words, a cluster can look full on the schedule and still be wasting nearly half of its compute cycles.

Why scheduling is genuinely hard

Deciding which job runs where and when looks like a simple queue, but it is a combinatorial optimization problem. There are many jobs, each with a size, a duration, a priority and sometimes a deadline. There are many resources with different skills and topologies. And there are competing objectives: throughput, waiting time, fairness between teams, energy and cost. Problems of this family are typically NP-hard, which means that no known method is guaranteed to find the best solution quickly as the problem grows.

In production, HPC centers therefore rely on batch schedulers such as Slurm, which combine priority rules with techniques like backfilling, where short jobs are slotted into gaps without delaying larger ones. They are robust and fast, but they follow fixed rules that cannot always anticipate what the workload will look like tomorrow.

Three levers: Exact, heuristic and learned

Modern approaches do not choose between methods. They combine three levers, each with a different role.

1. Exact optimization for planning

Mixed-integer programming can model resources, skills, availability and priorities precisely and prove how close a plan is to the best possible one. It is best suited to planning horizons of days or weeks, where the quality of the decision justifies the computing time. To keep it tractable, planners decompose the problem, for example by time window or by group of projects, and start the solver from a good heuristic solution.

2. Heuristics for scale

When the exact approach becomes too slow, heuristics and large neighborhood search take over. They repeatedly destroy and rebuild parts of a solution, quickly improving it without any guarantee of optimality but with very good results in practice.

3. Learning to guide the search

Machine learning adds a third lever. Research systems such as Decima use reinforcement learning to schedule jobs in data processing clusters, learning policies that outperform hand-tuned heuristics on the workloads they were trained for. The most pragmatic use of learning is as a guide rather than a replacement: predicting good starting solutions, choosing which part of a solution to improve next, or tuning solver parameters, while the optimizer keeps its guarantees.

Scheduling meets sustainability

Scheduling is also one of the most direct levers on the carbon footprint of computing. Google has described a carbon-aware system that forecasts the carbon intensity of the grid and shifts flexible workloads to times when the electricity is cleaner, while keeping total daily capacity unchanged so that jobs still finish on time. No hardware is replaced and no model is changed: only when the work runs changes.

This closes the loop with the first article of this series. Greener cooling and renewable power reduce the cost of each unit of compute, and smarter scheduling reduces the number of units wasted.

A new role for language models

Large language models open an additional door: the interface. Planning tools are powerful but hard to use, because every change to a constraint means editing a mathematical model. A language model can translate a request such as “this person is away in March and this project is now a priority” into a structured change, let the solver compute the answer, and then explain the result in plain words. The model talks and the solver computes. Keeping that separation is what makes the answer both accessible and trustworthy, and it makes the decision explainable: why a job was delayed, why a team received fewer resources, and what would change if a constraint were relaxed.

A matter of fairness and transparency

Scheduling is never purely technical. Allocating scarce compute among teams, projects and uses is a policy decision, and the rules behind it shape who can do research and how fast. As AI makes demand for compute grow, users and funders will increasingly expect these decisions to be transparent and explainable, in the same way they expect AI results themselves to be.

Conclusion

The most sustainable computation is the one that is not wasted. Between the energy that supercomputers consume and the intelligence they produce lies a layer that is easy to overlook, the decisions about who runs what, where and when. Exact optimization, heuristics and learning each bring something to this layer, and the most promising systems combine them, with language models as the interface that makes them usable.

The next generation of AI infrastructure will not be judged only on how much compute it has, but on how well it shares it.

References

International Energy Agency (2025). Energy and AI. Executive summary, iea.org/reports/energy-and-ai.

Jeon, M., Venkataraman, S., Phanishayee, A., Qian, J., Xiao, W., Yang, F. (2019). Analysis of Large-Scale Multi-Tenant GPU Clusters for DNN Training Workloads. USENIX ATC 2019, arXiv:1901.05758.

Radovanović, A. et al. (2021). Carbon-Aware Computing for Datacenters. arXiv:2106.11750.

Mao, H., Schwarzkopf, M., Venkatakrishnan, S. B., Meng, Z., Alizadeh, M. (2019). Learning Scheduling Algorithms for Data Processing Clusters. ACM SIGCOMM 2019.

Yoo, A. B., Jette, M. A., Grondona, M. (2003). SLURM: Simple Linux Utility for Resource Management. Job Scheduling Strategies for Parallel Processing (JSSPP).

Garey, M. R., Johnson, D. S. (1979). Computers and Intractability: A Guide to the Theory of NP-Completeness. W. H. Freeman.

About the author

Project Manger | France
Dr. Ait Kaci Célia is a project manager specializing in digital systems and high-performance computing (HPC), with a PhD in HPC and simulation from the University of Bordeaux and dual master’s degrees in applied mathematics, statistics, and HPC.

Leave a Reply

Your email address will not be published. Required fields are marked *

Slide to submit